We have started the refit of Zero, started by taking off all the kit and pulling down the headlinings. Revealing a number of leaks in the deck and windows, to be cured.
The galley and chart table area before
The galley and chart table area where the next to be looking at with Tim taking on dismantling the electrics and then the joinery in the chart table area and Jon taking on the galley. Finding a number of water traps, which has cased some of the joinery to have water ingress at the bottom of some of the joinery. It took us about a day to get all the joinery out leaving a large area of clear hull.
The galley and chart table area stripped
The next stage to redesign the galley and chart table area, to take the new instruments.